← Back to 119-HR3628

Bill text

State Planning for Reliability and Affordability Act

119-HR3628Referred in Senate12/15/20256,010 characters

This is the text of the Referred in Senate version, as published by the U.S. Government Publishing Office. Heard added line breaks and the quotation marks the printed bill shows; the words are unchanged. Bills change as they move, so check the official document for the current version. Heard is not affiliated with the U.S. Government Publishing Office.

IIB 119th CONGRESS 1st Session H. R. 3628 IN THE SENATE OF THE UNITED STATES December 15, 2025 Received; read twice and referred to the Committee on Energy and Natural Resources AN ACT To amend the Public Utility Regulatory Policies Act of 1978 to add a standard related to State consideration of reliable generation, and for other purposes. 1. Short title This Act may be cited as the “State Planning for Reliability and Affordability Act”. 2. State consideration of reliable generation (a) In general Section 111(d) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2621(d)) is amended by adding at the end the following: (22) Ensuring electric reliability with reliable generation facilities (A) In general Each State regulated electric utility that employs integrated resource planning shall establish, as part of such integrated resource planning, measures, sufficient to ensure the reliable availability of electric energy over a 10-year period, to maintain— (i) the operation of reliable generation facilities; or (ii) the procurement of electric energy from reliable generation facilities. (B) Reliable generation facility defined In this paragraph, the term reliable generation facility means an electric generation facility that ensures the reliable availability of electric energy by— (i) having operational characteristics to enable the generation of electric energy on a continuous basis for a period of not fewer than 30 days; (ii) having— (I) adequate fuel, or a continuously available energy source, on-site to enable the generation of electric energy on a continuous basis for a period of not fewer than 30 days; or (II) contractual obligations that ensure adequate fuel supply to achieve the generation of electric energy on a continuous basis for a period of not fewer than 30 days; (iii) having operational characteristics to enable the generation of electric energy during emergency and severe weather conditions; and (iv) providing essential services related to the reliable availability of electric energy, including frequency support and voltage support. . (b) Conforming amendments (1) Obligations to consider and determine Section 112 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2622) is amended— (A) in subsection (b), by adding at the end the following: (9) (A) Not later than 1 year after the date of enactment of this paragraph, each State regulatory authority (with respect to each State regulated electric utility for which the State has ratemaking authority) shall commence consideration under section 111, or set a hearing date for consideration, with respect to the standard established by paragraph (22) of section 111(d). (B) Not later than 2 years after the date of enactment of this paragraph, each State regulatory authority (with respect to each State regulated electric utility for which the State has ratemaking authority) shall complete the consideration and make the determination under section 111 with respect to the standard established by paragraph (22) of section 111(d). ; (B) in subsection (c)— (i) by striking “subsection (b)(2)” and inserting “subsection (b)”; and (ii) by inserting “In the case of the standard established by paragraph (22) of section 111(d), the reference contained in this subsection to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of that paragraph (22).” after “paragraph (21).”; and (C) by adding at the end the following: (i) Other prior State actions Subsections (b) and (c) shall not apply to the standard established by paragraph (22) of section 111(d) in the case of any State regulated electric utility in a State if, before the date of enactment of this subsection— (1) the State has implemented for the State regulated electric utility the standard (or a comparable standard); (2) the State regulatory authority for the State has conducted a proceeding to consider implementation of the standard (or a comparable standard) for the State regulated electric utility; or (3) the State legislature has voted on the implementation of the standard (or a comparable standard) for the State regulated electric utility during the 3-year period ending on that date of enactment. . (2) Prior and pending proceedings Section 124 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2634) is amended by inserting “In the case of the standard established by paragraph (22) of section 111(d), the reference contained in this section to the date of enactment of this Act shall be deemed to be a reference to the date of enactment of that paragraph (22).” after “paragraph (21).”. 3. GAO report on effectiveness of integrated resource planning in ensuring sufficient reliable generation facilities (a) Report Not later than 1 year after the date of enactment of this Act, the Comptroller General of the United States shall submit to Congress a report on the effectiveness of integrated resource planning employed by State regulated electric utilities prior to the implementation of section 111(d)(22) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2621(d)(22)), as added by section 2 of this Act, in ensuring sufficient reliable generation facilities to maintain the reliability, stability, and affordability of electric service for electric consumers. (b) Definitions In this section: (1) Electric consumer; integrated resource planning; State regulated electric utility The terms electric consumer, “integrated resource planning”, and State regulated electric utility have the meanings given such terms, respectively, in section 3 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2602). (2) Reliable generation facility The term reliable generation facility has the meaning given such term in section 111(d)(22) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2621(d)(22)), as added by section 2 of this Act. Passed the House of Representatives December 11, 2025. Kevin F. McCumber, Clerk.
Verify this text
SHA-256 of the file
14b7b5d04daf0c24d31c80bcc87f78b5758be47885ee8212b28d56d464cd38d5
Fetched
10/25/2026, 7:00:24 PM