SB 1629STATE · MissouriSigned

SB 1629 - Currently, an underground facility owner shall ensure that all new and active underground facilities installed after August 28, 2025, with the exception of storm sewers, shall be installed with a detectible underground location device unless the facility can be detected above ground with an electronic device. The act applies these provisions to underground facilities installed after August 28, 2026, with the exception of all storm sewers, regardless of the depth of installation. JULIA SHEVELEVA

SB 1629 - Currently, an underground facility owner shall ensure that all new and active underground facilities installed after August 28, 2025, with the exception of storm sewers, shall be installed with a detectible underground location device unless the facility can be detected above ground with an electronic device. The act applies these provisions to underground facilities installed after August 28, 2026, with the exception of all storm sewers, regardless of the depth of installation. JULIA SHEVELEVA

Voted: 7/9/2026Source

How representatives voted

0 yea·0 nay

No roll-call votes recorded for this bill yet.

Action history

  • 5/4/2026H Calendar Senate Bills for Third Reading
  • 4/29/2026Reported Do Pass H Rules - Legislative
  • 4/29/2026Voted Do Pass H Rules - Legislative
  • 4/28/2026Referred H Rules - Legislative
  • 4/15/2026Reported Do Pass H Utilities
  • 4/15/2026Voted Do Pass H Utilities
  • 4/1/2026Hearing Conducted H Utilities
  • 3/26/2026Referred H Utilities
  • 3/25/2026H Second Read
  • 3/24/2026H First Read