HB 87STATE · WyomingIntroduced
Omnibus water bill-planning.
This bill authorizes and provides funding for specified Water Development Program reconnaissance (Level I) and feasibility (Level II) studies. Amends a prior feasibility study for the Nowood River Storage – Alkali Cr. project. Comments: The Water Development Commission is required to report to the Legislature on each of the studies prior to the 2028 legislative session. See also the companion bill, 2026 Senate File 0070, Omnibus water bill-construction.
Voted: 3/6/2026Source
How representatives voted
0 yea·0 nay
No roll-call votes recorded for this bill yet.
Action history
- 3/6/2026Assigned Chapter Number 35
- 3/6/2026Governor Signed HEA No. 0020
- 3/4/2026S President Signed HEA No. 0020
- 3/4/2026H Speaker Signed HEA No. 0020
- 3/3/2026Assigned Number HEA No. 0020
- 3/3/2026S 3rd Reading:Passed 30-0-1-0-0
- 3/2/2026S 2nd Reading:Passed
- 2/27/2026S COW:Passed
- 2/25/2026S Placed on General File
- 2/25/2026S02 - Appropriations:Recommend Do Pass 4-0-1-0-0