A bill to require the Federal Energy Regulatory Commission to extend the time period during which licensees are required to commence construction of certain hydropower projects.

119-S1020Enrolled Bill2,350 characters

This is the text of the Enrolled Bill version, as published by the U.S. Government Publishing Office. Heard added line breaks and the quotation marks the printed bill shows; the words are unchanged. Bills change as they move, so check the official document for the current version. Heard is not affiliated with the U.S. Government Publishing Office.

One Hundred Nineteenth Congress of the United States of America 2d Session Begun and held at the City of Washington on Saturday, the third day of January, two thousand and twenty six S. 1020 IN THE SENATE OF THE UNITED STATES AN ACT To require the Federal Energy Regulatory Commission to extend the time period during which licensees are required to commence construction of certain hydropower projects. 1. Extension of time to commence construction of certain hydropower projects (a) Definition of covered project In this section, the term covered project means a hydropower project with respect to which the Federal Energy Regulatory Commission issued a license before March 13, 2020. (b) Authorization of extension Notwithstanding section 13 of the Federal Power Act (16 U.S.C. 806), on the request of a licensee of a covered project, the Federal Energy Regulatory Commission may, after reasonable notice and for good cause shown, extend in accordance with subsection (c) the period during which the licensee is required to commence construction of the covered project for not more than an additional 6 years beyond the 8 years authorized by that section. (c) Period of extension An extension of time to commence construction of a covered project under subsection (b) shall— (1) consist of not more than 3 consecutive 2-year periods; (2) begin on the date on which the final extension of the period for commencement of construction granted to the licensee under section 13 of the Federal Power Act (16 U.S.C. 806) expires; and (3) end on the date that is not more than 6 years after the latest date to which the Federal Energy Regulatory Commission is authorized to extend the period for commencement of construction under that section. (d) Reinstatement of Expired License If the time period required under section 13 of the Federal Power Act (16 U.S.C. 806) to commence construction of a covered project expires after December 31, 2023, and before the date of enactment of this Act— (1) the Federal Energy Regulatory Commission may reinstate the license for the applicable project effective as of the date of expiration of the license; and (2) the extension authorized under subsection (b) shall take effect on the date of that expiration. Speaker of the House of Representatives Vice President of the United States and President of the Senate
Verify this text
SHA-256 of the file
86777cbf89930464a065d381d0ccd50f1ec453d0c9aee8e4967acec15dd02eb7