SB 587STATE · HawaiiIntroduced

RELATING TO RENEWABLE ENERGY.

Requires the Public Utilities Commission to establish a streamlined grid-ready homes interconnection process, including vehicle-to-grid compliance requirements, by 1/1/2026. Authorizes the use of the Hawaii electricity reliability surcharge for cost recovery of certain expenses of the Hawaii Electricity Reliability Administrator associated with the grid-ready homes interconnection process. Requires a report to the PUC on the grid-ready homes interconnection process. Effective 1/1/2050. (SD1)

Voted 12/8/2025View source

Roll-call record

How representatives voted

6 yea·1 nay·3 other

Docket history

Action history

  1. 12/8/2025Carried over to 2026 Regular Session.
  2. 2/7/2025Report adopted; Passed Second Reading, as amended (SD 1) and referred to WAM.
  3. 2/7/2025Reported from EIG/CPN (Stand. Com. Rep. No. 89) with recommendation of passage on Second Reading, as amended (SD 1) and referral to WAM.
  4. 1/29/2025The committee(s) on EIG recommend(s) that the measure be PASSED, WITH AMENDMENTS. The votes in EIG were as follows: 3 Aye(s): Senator(s) Wakai, Chang, DeCoite; Aye(s) with reservations: none ; 1 No(es): Senator(s) Fevella; and 1 Excused: Senator(s) Richards.
  5. 1/29/2025The committee(s) on CPN recommend(s) that the measure be PASSED, WITH AMENDMENTS. The votes in CPN were as follows: 3 Aye(s): Senator(s) Keohokalole; Aye(s) with reservations: Senator(s) Fukunaga, McKelvey ; 0 No(es): none; and 2 Excused: Senator(s) Richards, Awa.
  6. 1/24/2025The committee(s) on EIG/CPN has scheduled a public hearing on 01-29-25 9:45AM; Conference Room 229 & Videoconference.
  7. 1/23/2025Referred to EIG/CPN, WAM.
  8. 1/17/2025Passed First Reading.
  9. 1/17/2025Introduced.