Bill text
Washington’s Trail—1753 National Historic Trail Feasibility Study Act of 2026
119-S4538Reported to Senate9/17/20261,375 characters
This is the text of the Reported to Senate version, as published by the U.S. Government Publishing Office. Heard added line breaks and the quotation marks the printed bill shows; the words are unchanged. Bills change as they move, so check the official document for the current version. Heard is not affiliated with the U.S. Government Publishing Office.
II
Calendar No. 658
119th CONGRESS
2d Session
S. 4538
IN THE SENATE OF THE UNITED STATES
May 14, 2026
Mr. Fetterman
(for himself,
Mr. McCormick
,
Mr. Kaine
,
Mr. Warner
,
Mr. Justice
, and
Mrs. Capito
) introduced the following bill; which was read twice and referred to the Committee on Energy and Natural Resources
September 17, 2026
Reported by
Mr. Lee
, without amendment
A BILL
To amend the National Trails System Act to direct the Secretary of the Interior to conduct a study on the feasibility of designating Washington’s Trail—1753 as a national historic trail, and for other purposes.
1. Short title
This Act may be cited as the “Washington’s Trail—1753 National Historic Trail Feasibility Study Act of 2026”.
2. Washington’s Trail—1753 National Historic Trail Feasibility Study
Section 5(c) of the National Trails System Act (16 U.S.C. 1244(c)) is amended by adding at the end the following:
(50) Washington’s Trail—1753
Washington’s Trail—1753, extending approximately 500 miles from Williamsburg, Virginia, to Fort LeBoeuf (now Waterford), Pennsylvania, following the route taken by George Washington and his party on his diplomatic mission to the French on behalf of Virginia Governor Robert Dinwiddie from October 31, 1753, to January 16, 1754, just prior to the start of the French and Indian War (1754–1763).
.
September 17, 2026
Reported without amendment
Verify this text
- SHA-256 of the file
- 97d860ce65c50023ea25afc11c425d2e8c17e7a050e3c4778cf711d8a0a15173
- Fetched
- 10/21/2026, 1:41:29 AM